The Purdue model is the most common way to draw an industrial network, in manufacturing as well as in energy and water supply. It sorts systems into levels, from the sensors on a machine or in a station up to the enterprise network and the internet. Standards, vendor slides and audit reports use it. We also use it in workshops and in our VLAN Planner. The model describes what a system does in operation. It does not say how the network should be separated. It can, however, help with structuring the network and as a basis for discussion.
Where the model comes from
The model goes back to the Purdue Enterprise Reference Architecture (PERA), which Theodore J. Williams and an industry consortium at Purdue University developed in the 1990s. PERA described how a manufacturing company is structured, from the physical process up to business planning.
ISA-95 took over the levels to define the interface between production and enterprise systems such as ERP and MES. The ISA-99 committee, whose work became IEC 62443, used the same levels as a reference model for industrial security. This is why the levels appear in almost every OT security document today.
The levels and what actually runs on them
The table shows the levels as they are usually drawn today, with level 3.5 for the DMZ between OT and the enterprise network.
From level 2 upwards, most systems are ordinary IT. SCADA servers, operator stations, MES, network control systems and historians run on Windows, often on versions that are no longer supported. HMIs on level 1 are often Windows devices as well, and the switches and routers in production are usually the same hardware as in the office. OT in the narrow sense, with proprietary firmware and protocols, is limited to PLCs, RTUs, IEDs and the field devices on level 0.
This matters for security. Ransomware that stops a production line or a control centre usually encrypts the Windows systems on levels 2 and 3. The controllers often keep running, but nobody can operate or monitor the plant any more. These systems need the same care as IT systems, with patches, backups and hardening, and with maintenance windows that suit operations.
Why the model is not a security architecture
The levels sort systems by their task in operation. A security architecture sorts them by what they must be protected from and how far an incident may spread. The model says nothing about either of these.
If you build the network along the levels, levels 0 and 1 become one large network. All PLCs, HMIs, drives and I/O of the plant then sit in the same segment. An infected HMI on line 1 can reach every PLC on line 3. A broadcast storm takes down all lines at once. In a utility the same applies to stations. Without separation, a compromised device in one substation can reach the RTUs in all the others. The model has no notion of lines, cells, stations or areas, so it gives no hint where to separate them.
Current devices often cover several levels. A PLC with a built-in web server and OPC UA server provides data that the model places on level 2 or 3. One industrial PC can be HMI, SCADA client and historian at the same time. Edge devices collect data on level 1 and send it to a cloud service. An RTU in a station is often also protocol converter, router and VPN endpoint.
Communication also skips levels. In the model, data moves up one level at a time. In practice, connections like the ones in the diagram below are common.
What the model is good for
As a basis for discussion, the model works well. IT, OT, machine builders, equipment suppliers and auditors can use the levels as a common language. When someone says level 2, everyone knows which systems are meant, even if their own installation is drawn differently.
The right column of the table helps to sort systems. A Windows server on level 3 needs patches and backups like any IT server. A PLC on level 1 needs protection at the network level, because it can rarely be patched.
The DMZ between levels 3 and 4 is still the most useful single rule from the model. The enterprise network and OT do not talk to each other directly. Data exchange and remote access go through systems in the DMZ. If the connection to IT is cut, operations keep running.
The levels are also a good starting template. Our free VLAN Planner starts from a Purdue template, which you then adapt to your installation.
From levels to zones
IEC 62443 does not require the Purdue levels as zones. It asks for zones, which are groups of systems with the same security requirements, and conduits, which are the controlled connections between them. How you cut the zones is up to you.
In our projects we start from the levels and then cut vertically. Systems that fail together go into the same zone. In manufacturing, each production line or cell usually gets its own zone with its PLCs, HMIs and local SCADA. In a utility, it is usually each station, such as a substation, a pumping station or a reservoir. An incident or a network problem then stays within that line or station. Systems that all of them use, such as the MES or the network control system and the historian, go into a site-wide operations zone or the control centre zone. Every connection between zones runs through a firewall with documented rules.
After that, every flow that crosses a zone boundary needs to be checked: which system talks to which, with which protocol, and who needs the connection. Our communication matrix and the segmentation toolbox help with that.
This article is based on a module of our OT network and security course at FHNW, where the Purdue model is one of the starting points for designing an OT network.
Frequently asked
What is the Purdue model?
A reference model that sorts industrial systems into levels by function, from the physical process (level 0) to the enterprise network (level 4) and the internet (level 5). It goes back to the Purdue Enterprise Reference Architecture (PERA) and is used in ISA-95 and IEC 62443.
What is level 3.5?
Level 3.5 is the DMZ between production (levels 0 to 3) and the enterprise network (levels 4 and 5). Systems that exchange data or provide remote access between the two sit there, for example jump hosts, patch servers or a historian replica. Neither side connects directly to the other.
Is the Purdue model still relevant?
As a common language and a starting point, yes. As a network design, only partly, because modern devices combine several levels and IIoT devices and cloud services skip levels. Use it to discuss and sort systems, and design zones and conduits based on what fails together and what needs to communicate.
How does the Purdue model relate to IEC 62443 zones and conduits?
IEC 62443 uses the levels as a reference model, but it asks for zones and conduits. A zone can contain systems from several levels, for example the PLCs, HMIs and SCADA client of one production line, or the RTU and protection devices of one substation. The levels describe the systems. The zones define the separation.
Does the HMI belong on level 1 or level 2?
A panel at the machine that only controls that machine is usually level 1. An operator station that monitors several machines or a whole line is level 2. For segmentation, the line or station the HMI belongs to matters more than its level.